He is a Electrical Engineer – Hydropower; in the field of industry and project management representing client and consultant. He was involved in various projects and Plants related to Hydropower and Transmission for study, component / system design & drawing, project development, operation and maintenance.

He got work experience in different countries as Nepal and India.

His Project and Job History 

 Electrical Engineer, Liberty Energy Company Limited, Upper Dordi ‘A’ HEP-25 MW, Nepal     Aug 2017 – Till Date

Electrical Engineer, Pan Himalaya Energy P. Ltd., Likhu-1 HEP-51 MW, Nepal                         Nov 2016 – Jul 2017

Electrical Engineer, Madhya Bhotekoshi Jalavidhyut Co. Ltd., Middle Bhotekoshi HEP-102 MW, Nepal                

                                                                                                                                                                         Jun 2011 – Nov 2016

Electrical Engineer, Chilime Hydropower Co. Ltd., Chilime Hydropower Plant-22 MW, Nepal Jul 2003 – May 2009

 

Consulting Works
  • Detail Engineering Design, Tender Document Preparation and Construction & Supervision of Electromechanical Works for Radhi Khola Small Hydropower Project (4.4 MW), Lamjung District, Radhi Bidhyut Company Limited (on operation).
  • Detail Feasibility Study of Sabha Khola-B Hydropower Project (15.1 MW), Sankhuwasabha District, Pokhari Hydropower Company P. Ltd.
  • Preparation of Electromechanical Tender Document for Rasuwagadhi Hydroelectric Project (111 MW), Rasuwa District.
  • Detail Design of 132 kV Transmission Line of Dordi-1 Hydroelectric Project.
  • Detail Engineering Design of Yambaling Khola Small Hydropower Project (7.27 MW), Sindhupalchowk District, Yambaling Hydropower Company P. Ltd.
  • Design Review, Tender Document Preparation and Construction & Supervision of Tallo Khare Khola Hydropower Project (11 MW), Dolakha District, Universal Power Company P. Ltd. (under construction)
  • Detail Design of Dordi-1 Hydroelectric Project (12 MW), Lamjung District, Dordi Jal Bidhyut Company Limited. (under construction)
  • Detail Design and Tender Document Preparation of 33 kV Transmission Line of Rukumgad Hydropower Project, Rukum District, Rapti Hydro & General Construction Pvt. Ltd.
  • Detail Design and Tender Document Preparation of 132 kV Transmission Line from Tallo Khare Khola Hydropower Project to Singati Substation of Universal Power Company Limited, Dolakha District.
  • Feasibility Study of Nupche Likhu Hydropower Project (57 MW), Vision Energy & Power Pvt. Ltd.
  • Feasibility Study of Sunigad Hydropower Project (17 MW), Omega Energy Developer Pvt. Ltd.
  • Design Review and Construction & Supervision of Namarjun Madi Hydropower Project (12 MW), Himalayan Hydropower Pvt. Ltd. (under construction).
  • Feasibility Study of Aankhu Khola-2 Hydropower Project (20 MW), Gorakshya Hydropower Company Pvt. Ltd.
  • Design review and Tender Document Preparation of Super Aankhu Khola Hydropower Project (25 MW), Gorakshya Hydropower Company Pvt. Ltd.