FEATURED PROJECTS
Upper Myagdi (53.5 MW) Hydroelectric Project, Nepal
Upper Myagdi is peaking run-of-river type hydropower project with installed capacity of 53.5 MW located at Myagdi District, Gandaki Province, Nepal. Salient features of the project include: underground desanding system, 4m dia 5.5km long headrace tunnel, surface powerhouse with two Francis turbines of 26.75MW capacity.
READ MORE
Middle Mewa (73.5 MW)
Hydroelectric Project, NepalMiddle Mewa is peaking run-of-river type hydropower project with installed capacity of 73.5 MW located at Taplegunj district, Nepal. Salient features of the project include: gross head of 475m, 5,430 m head race tunnel, design discharge of 19.02 m3/s
SUNGAI BENGKOKA MINI HYDRO, Malaysia
The project is located on the northern part of Sabah in the district of Kota Marudu. Sungai Bengkoka is one of the main rivers in Kota Marudu with Sungai Togohu as a tributary.
READ MORE
- (DCs is official reseller)
BricsCAD is computer Aided Design Software for people who build things. it’s the best choice for Deigners, Drafter, Architects and Engineers. BricsCAD leverages the power of artifical intelligence to help you work faster and more accurately.
READ MORE
OUR SERVICES
Darshan Consulting Services' projects are generally focused on high-growth prospective sectors that have a major impact on socioeconomic development. The sections that follow provide more information on each of the sectors.
Procurement
Services
Construction Management
Services
Management
Services
Engineering Design
Services