
Phukot Karnali Hydroelectric Project (426 MW), Nepal
DCS conducted hydraulic modelling for the reservoir operation with sediment Bypass tunnel for the Project. The numerical modelling also included checking behavior of downstream of bypass intake gate. It was concluded that proposed sediment bypass tunnel can extract about 80% of the sediment load.
Client: NEA Engineering Company Ltd, Thapathali, Kathmandu
Duration: 2017-18